User name:
Password:
Forgot password?
Create an account!
« back
by abhishekbij, Sep 01, 2010 15.04
Watch this directly on YouTube
On 26th August 2010, Unit 4 at SSAA successfully aggregates the design components. Each component with embedded joining detail aggregated to: 1. GROW 2. form an 18 sided 3d Geometry 3. Find touch down points to stabilize the installation. Construction Team - Unit 4 | Sushant School of Art and Architecture, Gurgaon Construction Location - SSAA_Amphitheater Construction time - 3 hrs http://ssaa-pnp.blogspot.com/
Why are these buttons gray?